Every renovation is different. Tiles are different, layouts are different, electrical and plumbing are different. But in all these differences, we’ve come up with a schedule that is pretty much the same every time. So if you’re about to have your home invaded by tradies and you’re feeling a bit overwhelmed by the process, here’s a schedule of how we run things (99% of the time anyway!).

  1. Old kitchen is removed by Nyblad Construction (includes any wall removals, plumbing and electrical modifications) and plastering is installed.
  2. Cabinetry is installed by your chosen cabinet maker.
  3. Laminated bench tops installed OR stone bench tops are templated by your chosen bench top provider.
  4. Any plastering and/or cornice installed will be set and sanded.
  5. Upon installation of bench tops (note: stone bench tops are installed around 10 days from template), plumbing is reconnected.
  6. Tiled splashback is installed once the bench top has been installed (note: Glass splashbacks are installed by your chosen cabinet maker approximately 10 days from day of measure – the day after the bench tops are installed).
  7. Electrical re connection of appliances and power points and painting (if included in quote).

Being without a kitchen is hard. That’s why we try to make this process as quick as possible. Generally we will remove and dispose of the existing kitchen the day before your chosen cabinet maker begin installing the new kitchen.

You may also find that on some days you will have multiple trades in your home and the next there may be none. Don’t be alarmed! It probably means we’re allowing time for things to set, dry, be delivered etc, and we’ve accounted for this in our timeline. Your renovation will be completed as per your contract. And if something should go very wrong and we’re delayed, we’ll let you know straight away.

While you wait for us to finish, why not go pick yourself up a new cook book and some new crockery to match your new kitchen?

If you have any questions about your renovation, please don’t hesitate to contact us on 0412 679 990 or email admin@nyblad.com.au.